- Vance Brand (CAPCOM)
-
Roger. We copy, and could you give us the frame number on that last picture, please?
- Fred Haise (LMP)
-
Okay. We've been writing them all down, Vance, as we went, but that one turned out to be 29.
- Fred Haise (LMP)
-
Okay, Jack says I can't read the camera very well. It should be 28 based on our start frame.
- Vance Brand (CAPCOM)
-
13, Houston. Understand, though, the number showing that you read on the camera was 28. Is that affirm?
- Fred Haise (LMP)
-
Yes. The readability of that thing is like, you know, half a frame one way or the other; so, 28, I think, is a good number.
- Vance Brand (CAPCOM)
-
Fred, did you get any MASTER ALARMS up there about 5 or 10 minutes ago? Folks thought they saw some here and they were curious about it.
- Fred Haise (LMP)
-
Yes. We got another O2 FLOW HIGH on—I guess it was about 5 minutes ago.
Expand selection up Contract selection down Close - Vance Brand (CAPCOM)
-
Okay.
Expand selection down Contract selection up - Jack Swigert (CMP)
-
Yes. We were rigging the siren device over the MASTER ALARM, and we were running a test on it.
- Vance Brand (CAPCOM)
-
Okay. Good enough. And anytime you're ready to copy, I've got a pad P37 block data.
- Vance Brand (CAPCOM)
-
Okay. P37 block data, starting with GETI. 025:00, 5119, minus 165, 071:08; 035:00, 7733, minus 165, 070:36; 045:00, 6208, minus 165, 094:52; 060:00, 5993, minus 165, 118:53. Over.
- Jack Swigert (CMP)
-
Okay. 025:00, 5119, minus 165, 071:08; 035:00, 7733, minus 165, 070:36; 045:00, 6208, minus 165, 094:52; 060:00, 5993, minus 165, 118:53.
- Vance Brand (CAPCOM)
-
Stand by 1. We need the LM/CM DELTA-P for one thing, and I'll check back in a minute with the others.
- Jim Lovell (CDR)
-
Okay. And we still have the vent valve open. We'll close it one of the last things and looking at LM/CM DELTA-P right now and I see 0.5 in psi indicated.
- Vance Brand (CAPCOM)
-
Only other readouts we need are those on page 3-13 of the flight plan. BAT C, pyro BAT A, pyro BAT B, RCS A, B, C, and D readings, and DC INDICATOR select main A or B.
- Fred Haise (LMP)
-
And, Vance, we're still charging BAT B. Did you want to dispense with that in a few minutes?
- Jack Swigert (CMP)
-
Okay, BAT C is 37, pyro BAT A is 37, pyro BAT B is 37, RCS A 94 percent, B 95 percent, C 93 percent, D 96 percent.
Spoken on April 12, 1970, 7:12 a.m. UTC (54 years, 7 months ago). Link to this transcript range is: Tweet