- Fred Haise (LMP)
-
Okay. It says maneuver in ATT HOLD for Moon view attitude until CM platform release.
- Vance Brand (CAPCOM)
-
That's affirm. Better worded, it would have been maneuver and hold in attitude for Moon view, et cetera.
- Fred Haise (LMP)
-
Okay. The master title, “Entry, LM PREP, EI minus 6 hours.” First, BAT 5 NORMAL FEED, ON; second, use modified LM DPS/RCS, 30-minute activation checklist. Next, is at TEI minus 5 hours, MCC-7, if required. Now, we have a LM preentry procedure. First, we maneuver to service module SEP attitude. Second, configure for CSM hotfire. Under that, DEADBAND MAX, and ATTITUDE CONTROL, three, to PULSE. Thirdly, perform CSM hotfire. Fourth, we—The LM maneuvers back to SM SEP attitude, with ATTITUDE CONTROLs, PITCH and ROLL to PULSE, ATTITUDE CONTROL, YAW, to MODE CONTROL. Now, you got that so far, Vance?
- Fred Haise (LMP)
-
Okay. At EI minus 4-1/2 hours, configure for SM SEP. First, BALANCE COUPLE, ON. Secondly, zero the counters in AGS; 404, 405, 406, plus 0; read out 470. Thirdly, translate plus-X to 0.5 foot per second. Fourth, CM/SM SEP. Fifth, after SEP, null 470 to 0. Sixth, ATTITUDE CONTROL, three, to PULSE. Seventh, pitch to acquire service module for photos. And a note, use the ACA for control. Last, we had—you gave me was TEI minus 3 hours. Maneuver in ATT HOLD for Moon view until the CM platform release.
- Vance Brand (CAPCOM)
-
Okay, Fred. Only—Only a minor point that we just picked up. At the very top, EI minus 6 hours, the title is “power up,” above BAT 5 NORMAL FEED, ON.
- Vance Brand (CAPCOM)
-
Okay. And on the last, it was maneuver and ATT HOLD for Moon view attitude until CM platform release. I think that's what you read. Okay. Ready to go on? EI minus—Are you there?
- Fred Haise (LMP)
-
Okay. This assumes all descent BATs on line, and ASCENT BATs 5 and 6 on NORMAL FEED. Go ahead.
- Vance Brand (CAPCOM)
-
Next. CB, LM POWER 2, MAIN B, open.
Expand selection up Contract selection down Close - Fred Haise (LMP)
-
Okay. CSM, CB LM POWER 2, MAIN B, open.
Expand selection down Contract selection up - Vance Brand (CAPCOM)
-
Okay. Next, the LM. CB, EPS panels 11 and 16, CROSS TIE BALANCE LOADS to close.
Spoken on April 17, 1970, 3:55 a.m. UTC (54 years, 7 months ago). Link to this transcript range is: Tweet